DFBR-1
Deep Fission Borehole Reactor concept, a pressurized water SMR deployed underground in a borehole. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled. The NRC page updated 15 September 2026 describes each DFBR1 as producing 45 MWt of steam and up to 15 MWe, in pre-application docket 99902126. This is a design description, not an approved reactor or achieved output. Its relationship to the separate Gravity pilot configuration is not established here.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The NEA third edition describes DFBR-1 as an underground, borehole-deployed, pressurised water SMR. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Deep Fission
- Fuel form
- uranium-oxide ceramic fuel
- Enrichment
- LEU, less than 5% U-235
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: sources conflict; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 126 - U.S. NRC: DFBR-1 (company, published Jun 2024, accessed 14 Oct 2026)
- NRC Deep Fission DFBR1 pre-application overview (regulator, page updated 15 Sep 2026, accessed 17 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The NEA third edition describes this design as an underground borehole-deployed pressurised-water reactor from Deep Fission. The NRC page last reviewed on 15 September 2026 says each DFBR-1 produces 45 MWt of steam and up to 15 MWe, in a combined-license pre-application. The 2024 Deep Fission white paper, filed as the DB-PWR conceptual design, says each reactor produces 30 MWt and up to 10 MWe. Those two reusable statements disagree, so no output is stored. Stored vendor, light-water coolant and thermal spectrum stay, and the family is PWR on the NEA description. No site is named and linked deployments are empty. Pre-application is not a project permission. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); NRC Deep Fission DFBR1 pre-application overview; U.S. NRC: DFBR-1
What would change this
An NRC review of the DFBR-1 conceptual design description that states one current module output and basis. Next scheduled check: 19 Jan 2027.
- Module rating: Sources conflict. The 15 September 2026 NRC overview states 45 MWt and up to 15 MWe for each DFBR-1. The 2024 DB-PWR white paper on the same pre-application states 30 MWt and up to 10 MWe. Neither figure is stored. Last checked 19 Oct 2026. NRC Deep Fission DFBR1 pre-application overview; U.S. NRC: DFBR-1
What would change this
The NRC review of the conceptual design description, which would show whether 45 MWt and 15 MWe replaced the 2024 figures. Next scheduled check: 19 Jan 2027.
- Technology family. The NEA third edition describes DFBR-1 as an underground, borehole-deployed, pressurised water SMR. Last checked 3 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A Deep Fission or NRC document that changes the DFBR-1 reactor type or layout. Next scheduled check: 3 Feb 2027.