HECTAR
Helium Cooled Thermal Application Reactor. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
The profile calls HECTAR a land-based high-temperature gas-cooled reactor. - Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Korea Atomic Energy Research Institute
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 160
Evidence and open questions
(4 notes)
- Evidence review. The NEA third edition expands HECTAR as HElium Cooled Thermal Application Reactor and describes a land-based high-temperature gas-cooled reactor for high-temperature steam, with KAERI leading the reactor design. That entry explicitly supports helium coolant and HTGR classification. The thermal spectrum remains as recorded. No numerical module rating is assigned on this identity profile, and the reviewed entry establishes no deployment site. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A KAERI specification that states the module steam or electrical output with a basis. Next scheduled check: 19 Jan 2027.
- Coolant. The expanded name on the NEA profile is Helium Cooled Thermal Application Reactor. Stored coolant unknown is not supported. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A KAERI design document that names a different primary coolant would reopen this. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. No reusable passage states a module output. NEA table figures are not reused. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.
- Technology family. The profile calls HECTAR a land-based high-temperature gas-cooled reactor. The stored family HTGR matches that wording. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A KAERI notice that the concept is not an HTGR would reopen the family. Next scheduled check: 19 Jan 2027.