Designs

LEUNR

Commercial pressurized water SMR proposed from the SLOWPOKE-2 research-reactor technical basis. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Pressurized water reactor (PWR)
The NEA third edition describes LEUNR as a pressurised light water microreactor; its developer has since retired the concept.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Canadian Strategic Missions Corporation
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(3 notes)
  • Evidence review. The NEA third edition describes LEUNR as a pressurised light-water microreactor for earth and space applications and says Canadian Space Mining Corporation signed a licencing term sheet with Canadian Nuclear Laboratories. A company release dated 9 September 2026, from Canadian Strategic Missions Corporation, formerly Canadian Space Mining Corporation, says the firm is retiring the former LEUNR concept in favor of POLAR-1, JAY-1 and ORCA-1. The stored vendor name matches that rebrand. No reusable source states a LEUNR module output, so none is stored. The successor platforms are not this record. The NEA siting line names no LEUNR deployment. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); CSMC unveils POLAR-1, JAY-1 and ORCA-1 and retires the LEUNR concept
    What would change this

    A CSMC statement that maps POLAR-1, JAY-1 or ORCA-1 back onto the LEUNR design, or a specification of the retired concept's output. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No reusable passage states a LEUNR module output. NEA table figures are not reused, and the successor platforms are not used as a rating for this record. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.

  • Technology family. The NEA third edition describes LEUNR as a pressurised light water microreactor; its developer has since retired the concept. Last checked 3 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); CSMC unveils POLAR-1, JAY-1 and ORCA-1 and retires the LEUNR concept
    What would change this

    A Canadian Strategic Missions or NEA document that changes the LEUNR reactor type. Next scheduled check: 3 Feb 2027.