LFTR

Lithium Fluoride Thorium Reactor concept. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
Evidence
3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Flibe Energy
Fuel form
LiF-BeF2-UF4
Development status (as stated)
Conceptual design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. The NEA third edition describes the LFTR as Flibe Energy's lithium-fluoride molten-salt reactor to produce power and isotopes while breeding thorium. The ARIS record classifies it as a graphite-moderated thermal-spectrum design by Flibe Energy. The same NEA profile says Flibe Energy has been in NRC pre-licensing. No reusable source states a module output, so none is stored. Stored vendor, family MSR, molten-salt coolant and thermal spectrum stay. The NEA siting line names no site. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); IAEA ARIS design record: LFTR
    What would change this

    A Flibe Energy or NRC specification that states the LFTR module output with a basis. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No reusable passage states a module output. NEA and ARIS figures are not reused. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.