Designs

MN-1

Mobile gas-cooled reactor coupled to a supercritical carbon-dioxide turbine-generator. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
MobileNuclear Energy
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(3 without a known value)
Coolant
Not recorded
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(3 notes)
  • Evidence review. The NEA third edition says MobileNuclear Energy's design is for military installations, emergency response, off-grid and industrial sites, and marine propulsion, and it describes a mobile high-temperature gas-cooled reactor. It also says the design couples a gas-cooled reactor to a super-critical carbon-dioxyde turbine-generator. The gas used as reactor coolant is not named. A search found trade reports of a helium blower in the conversion equipment, but those pages were not captured and are not used as coolant or output evidence. No reusable captured source states a module output, so none is stored. Stored vendor, family HTGR and thermal spectrum stay, and coolant stays unknown. The NEA siting line names no specific site. MobileNuclear Energy's release of 20 May 2025 says it renamed its MN-1 Mobile Power Module the MN-350 Mobile Power Module. SMRMap's MN-350 record lists Scaled Atomics as developer, and no source read here connects the two companies' designs, so the records are not merged. The 350 kWe in that release is not stored on this identity profile. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); MobileNuclear Energy: new name for flagship microreactor system, MN-350 Mobile Power Module (20 May 2025)
    What would change this

    A MobileNuclear Energy specification that names the reactor coolant gas and states a module output. Next scheduled check: 19 Jan 2027.

  • Coolant: Not disclosed in the reviewed evidence. The profile says gas-cooled and names a super-critical carbon-dioxyde conversion system. It does not name the reactor coolant gas. A helium blower in an uncaptured trade report is not used. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A MobileNuclear primary page that names the primary coolant. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. MobileNuclear Energy's release of 20 May 2025 states 350 kWe for the renamed MN-350; under the identity-only rule it is not stored here. NEA table figures are not reused, and uncaptured press figures are not used. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.