MoveluX
MoveluX is Toshiba's heat-pipe-cooled, calcium-hydride-moderated multipurpose microreactor, at conceptual design in the 2020 IAEA booklet.
- Reactor type
- Heat-pipe microreactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Coolant
- Other (see description)
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Toshiba Energy Systems & Solutions Corporation
- Fuel form
- U3Si2
- Development status (as stated)
- Conceptual design
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 236 - IAEA ARIS design record: MoveluX (IAEA/NEA, accessed 2 Oct 2026)
- IAEA 2020 SMR book: HTR-10 technical table (IAEA/NEA, accessed 8 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2020 IAEA booklet describes Toshiba Energy Systems' MoveluX as a 10 MW(t) class multipurpose microreactor that generates around 3 to 4 MW(e), using a heat pipe for primary cooling, with no bulk coolant and a sodium heat pipe, and a helium secondary loop. The NEA third edition calls it a heat-pipe-cooled calcium-hydride-moderated microreactor in conceptual design. ARIS says sodium is the heat-pipe working fluid. Stored vendor, thermal spectrum and family other stay. Coolant stays other because the booklet's own coolant entry is none, qualified as sodium heat-pipe cooling, rather than a bulk sodium circuit. The booklet output is not stored. No site is named. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; NEA Small Modular Reactor Dashboard — Third Edition (2025); IAEA ARIS design record: MoveluX
What would change this
A Toshiba specification that replaces the 10 MW(t) class and approximate 3 to 4 MW(e) figures with a single basis. Next scheduled check: 19 Jan 2027.
- Module rating. The 2020 booklet says MoveluX is a 10 MW(t) class reactor and generates around 3 to 4 MW(e). The figure is not stored on this identity profile. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table
What would change this
A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.