How a heat-pipe microreactor works
eVinci is a heat-pipe microreactor: it has no bulk primary coolant, that is, no body of liquid or gas flowing through the core, and sealed heat pipes holding sodium carry heat from the core to a heat exchanger.[1, pp. 413, 414, 415]
This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the eVinci record. SMRMap tracks 5 projects using it, and each project's record carries its status.
- Heat moving along the sealed pipes, as the section's text gives
- Liquid coming back inside a pipe, drawn just below it: from the catalog's generic picture of a heat pipe, not its text
- Heat transferred to the open-air power conversion system; air intake, internal routing and exhaust are not drawn
The parts, numbered as in the figure
1. Reactor canister
A canister encases the whole core; the section's containment part calls it the canister containment subsystem and says it is designed to contain the fuel and fission products.[1, p. 416] The table gives no vessel size or weight, so this drawing has no stated dimensions.[1, p. 413]
2. Graphite core block
The core is a single six-sided block of graphite with a pattern of channels through it, for heat pipes and fuel compacts.[1, p. 415] Graphite is also the moderator, the material that slows the neutrons so the fuel can keep a chain reaction going.[1, p. 413]
3. TRISO fuel compacts
The fuel is TRISO, tiny coated grains of uranium fuel, enriched to 19.75% and arranged in compacts that sit in the block's channels.[1, pp. 415, 417] The section says the core can run 8 or more years at full power without refueling, and refueling is not done on the customer's site.[1, p. 417]
4. Sodium heat pipes
The pipes sit in channels in the core, and each one is fully enclosed, with sodium inside.[1, pp. 414, 415] Capillary forces, the wicking that pulls water up a paper towel, and pressure differences move the heat from one end of the pipe to the other, with no coolant pump in the primary system.[1, pp. 414, 415] The catalog's generic picture of a heat pipe shows vapor moving to the cool end and liquid coming back along a wick.[1, p. 414]
5. Control drums
Radial drums around the core adjust the reactor's power, which is reactivity control, and shut it down. Separate shutdown rods can also enter the core.[1, p. 415]
6. Shutdown rods
Shutdown can also be done with rods that go into the core block.[1, p. 415] The catalog's drawing shows them coming in from one end of the canister, as the figure does.[1, p. 415]
7. Heat exchanger
The heat pipes carry the heat to this exchanger, which passes it to the power conversion system.[1, p. 415] The catalog's drawing labels it the primary heat exchanger and shows it at the far end of the pipes, past a section it labels shielding and bulkhead.[1, p. 415]
8. Power conversion system
It uses an open-air Brayton cycle, a gas turbine cycle that takes in outside air and exhausts it rather than recirculating one charge, to turn the heat into electricity.[1, p. 413] The section says the reactor and this system fit in one standard transport container, with the electronics and controls in a second.[1, p. 413]
The heat path
- Heat from the fuel goes into the heat pipes, which run through channels in the core.[1, pp. 413, 415]
- The sodium sealed in each pipe moves the heat along it, driven by capillary forces and pressure differences.[1, p. 414]
- At the far end the pipes give up the heat to the heat exchanger and on to the working fluid of the power conversion system, the gas that drives its turbine.[1, pp. 414, 415]
- An open-air Brayton cycle turns that heat into electricity.[1, p. 413]
- The section's text does not describe what happens inside a pipe in more detail, or how the working fluid moves through the power conversion system, and its table lists coolant temperatures as not applicable.[1, pp. 413–417]
- The dashed line in the pipes follows the catalog's generic picture of a heat pipe, which shows liquid returning along a wick. The separate arrow to power conversion shows heat transfer only; outside-air intake and exhaust are not drawn.[1, p. 414]
Where are the coolant and the coolant pumps?
The section says eVinci has no bulk primary coolant, and that with heat pipes its primary system needs no coolant pumps.[1, pp. 414, 415] This is eVinci. SMRMap lists a design here when its record describes a reactor whose heat leaves through heat pipes, and those designs can differ; the interactive view shows eVinci only. One listed record differs on that first point: NuScale's microreactor record describes a liquid moderator-coolant, with heat pipes as the heat-exchange interface to power conversion, so it does have a bulk coolant.
- Coolant. The table's coolant entry is heat pipes with sodium, and the sodium stays sealed in each pipe.[1, pp. 413, 414]
- Pumps. That statement is about the reactor's primary system, the heat pipes that take heat out of the core; the section does not say what moves air through the separate Brayton power conversion system.[1, pp. 413, 415]
- HARPIA. Another heat-pipe design in the same catalog; its table also lists heat pipes as the coolant, with beryllium oxide and graphite as moderator.[1, p. 419]
Design values
These are values listed in the catalog section, which the developer supplied.[1, p. 413]
- Power. 15 MW(t) of heat and 5 MW(e) of electricity.[1, p. 413]
- Pressure. The table's pressure row lists 0.12 MPa for the primary side, a little above atmospheric pressure, and does not say whether that is inside the heat pipes or the canister.[1, p. 413]
- Fuel. Enrichment 19.75%; the table gives a refueling cycle of 8 full-power years.[1, pp. 413, 417]
- Size. The table lists no vessel dimensions and no core temperatures.[1, p. 413]
Designs on SMRMap recorded as this type
8 designs, with 9 tracked projects between them. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it.
| Design | Class | Electrical output | Tracked projects |
|---|---|---|---|
| ELYON-5 | Microreactor | 5 MWe (gross/net unspecified) · module | None tracked here |
| eVinci | Microreactor | 5 MWe (gross/net unspecified) · module | 5 |
| HARPIA | Microreactor | — | None tracked here |
| MoveluX | Microreactor | — | None tracked here |
| NuScale microreactor | Microreactor | — | None tracked here |
| NuSun-1 | Microreactor | — | 1 |
| R1 | Microreactor | — | 3 |
| ZiaCore | Microreactor | — | None tracked here |
Sources
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). eVinci section, printed pages 413–417; HARPIA section, printed page 419. Each section is contributor material; the eVinci section was supplied by Westinghouse Electric Company.