Nuclearis N1
Nuclear Microreactor design. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Pressurized water reactor (PWR)
The NEA SMR Dashboard describes the N1 as an integrated PWR without stating where its primary circuit sits, so the integral classification is not recorded; the developer's own pages returned access-denied responses. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Nuclearis Energy
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: source unavailable; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 196 - Nuclearis Energy technology page (company, accessed 20 Oct 2026)
- Nuclearis Energy homepage (company, accessed 20 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The only attached source is the NEA SMR Dashboard, which this attempt did not quote. Two Nuclearis Energy pages, the technology page and the homepage, were fetched on 20 October 2026 and both returned an access refusal (HTTP 403) with a 52-byte forbidden response. No passage naming Nuclearis N1 was read, so version, purpose, developer, technology, output, status, and deployment are not answered from a permitted source. Last checked 20 Oct 2026. Nuclearis Energy technology page; Nuclearis Energy homepage
What would change this
A readable Nuclearis Energy page or filing that names the N1 design and its output basis. Next scheduled check: 20 Jan 2027.
- Module rating: Source unavailable. The developer technology page and homepage returned an access refusal (HTTP 403). The NEA dashboard was not used, so no module rating was read. Last checked 20 Oct 2026. Nuclearis Energy technology page
What would change this
A readable Nuclearis specification stating N1 megawatts. Next scheduled check: 20 Jan 2027.
- Technology family. The NEA SMR Dashboard describes the N1 as an integrated PWR without stating where its primary circuit sits, so the integral classification is not recorded; the developer's own pages returned access-denied responses. Last checked 1 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); Nuclearis Energy technology page; Nuclearis Energy homepage
What would change this
A readable Nuclearis, regulator or IAEA description that states where the N1's primary circuit sits. Next scheduled check: 1 Feb 2027.