Otrera 2x300

Compact sodium-cooled fast reactor for cogeneration. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of Natrium, this type's example. On the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump.
Schematic of Natrium, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Sodium-cooled fast reactor (SFR)
Coolant
Sodium
Spectrum
Fast
Developer / vendor(s) as of 14 Feb 2025
Otrera New Energy
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. This record remains the catalog identity named Otrera 2x300. The attached NEA dashboard text is not used for output figures. The developer homepage opened on 20 October 2026 describes sodium-cooled fast modular reactors that cogenerate electricity and heat, and a simplified architecture of six 50 MWth modules. The developer technology page describes a loop-type fast-neutron concept with three alternating vessels, two in operation and one cooling, a range from 30 to 450 MWe, and a 50 MWth figure for the reactor range. Neither page names Otrera 2x300, so those figures are not assigned to this catalog version, are not divided or multiplied into a pair rating, and are not stored. No SMRMap deployment is linked. Stored vendor, SFR, sodium coolant and fast spectrum already match the developer classification and are not changed. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); Otrera English homepage; Otrera technology page
    What would change this

    A developer or regulator document that uses the name Otrera 2x300 and states whether that name is one module or a pair, with a qualified per-module output. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No opened source states a module rating for the named version Otrera 2x300. NEA output figures are not reused. The 2026 developer pages give a six-module 50 MWth architecture, a 30 to 450 MWe range, and a 50 MWth range figure, but they do not name this catalog version. Those figures are not stored, and a pair total is not treated as a module rating. Last checked 19 Oct 2026. Otrera English homepage; Otrera technology page; NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A primary page that explicitly labels Otrera 2x300 and separates one module's output from the pair. Next scheduled check: 19 Jan 2027.