SALUS-100
KAERI sodium-cooled fast-reactor concept developed using experience from PGSFR, with a different core configuration. A May 2022 KAERI paper gives SALUS 100 MWe and 268 MWth, with U-10Zr fuel; electrical gross/net is unspecified. It contrasts PGSFR at 150 MWe and 392.2 MWth. This historical technical description and the later NEA catalog identity do not establish current commercial availability, a deployment or permission.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 13 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Korea Atomic Energy Research Institute
- Module electrical
- 100 MWe (gross/net unspecified)
- Module thermal
- 268 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 13 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 162 - KAERI: Comparison of REBUS-3 and McCARD Depletion Calculations on a Long-term Sustainable Small Modular Reactor, SALUS (company, dated May 2022, accessed 13 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The attached NEA dashboard was not quoted. A Korea Atomic Energy Research Institute paper for the Korean Nuclear Society meeting of 19-20 May 2022 describes the conceptual design of SALUS, defined as a Small, Advanced, Long-cycled and Ultimate Safe sodium-cooled fast reactor, developed from PGSFR experience. The SALUS column is 268 MWth and 100 MWe, with U-10Zr fuel and no refueling during a 20-year cycle. PGSFR is listed separately at 392.2 MWth and 150 MWe. Gross versus net is not stated. The paper does not name a site, a license, or a deployment. Stored family, coolant, spectrum, and the two ratings already match these figures, so no field is changed. Last checked 20 Oct 2026. KAERI: Comparison of REBUS-3 and McCARD Depletion Calculations on a Long-term Sustainable Small Modular Reactor, SALUS
What would change this
A later KAERI or regulator document that dates a SALUS license or states gross versus net output. Next scheduled check: 20 Jan 2027.