SEALER-One
Nuclear demonstration reactor planned after an electrically heated prototype. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Blykalla
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 110 - Blykalla: MoU with Norsk Kjernekraft naming SEALER-One (26 February 2025) (company, accessed 20 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The NEA dashboard was not quoted. Blykalla's 26 February 2025 press release names SEALER-One as Blykalla's first reactor, in Sweden, and says the MoU covers licensing, financing, construction, and operation, including a possible SEALER-One project company. The same release discusses deploying SEALER, not specifically SEALER-One, in Norway. It calls the reactors being brought to Scandinavia lead-cooled SMRs. The company description on that page says Blykalla commercializes lead-cooled fast reactors and that SEALER technology is a 55 MWe unit; that sentence is not labeled SEALER-One. Criticality by 2030 is a company plan for its first SEALER reactor, not an achieved license. No fuel form is stated. The separate technology page was fetched but does not name SEALER-One, so it is not cited. Last checked 20 Oct 2026. Blykalla: MoU with Norsk Kjernekraft naming SEALER-One (26 February 2025)
What would change this
A Blykalla specification that assigns output, fuel, and spectrum to SEALER-One itself rather than to SEALER technology generally. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The 26 February 2025 release states 55 MWe for SEALER technology in the company description. The SEALER-One sentence does not state megawatts. This identity-only profile would not store a rating in any case. Last checked 20 Oct 2026. Blykalla: MoU with Norsk Kjernekraft naming SEALER-One (26 February 2025)
What would change this
A Blykalla data sheet that states SEALER-One megawatts and the electrical basis. Next scheduled check: 20 Jan 2027.