START
START is Transmutex's accelerator-driven, lead-cooled fast reactor concept with thorium as the primary fuel, as described in the company's 2026 slides.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- Transmutex
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 240 - Transmutex: PAU 2026 slides naming START (company, accessed 20 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The NEA dashboard was not quoted. The current Transmutex homepage fetched the same day is about HI-BEAM medical isotopes and does not name START, so it is not cited. A Transmutex slide deck labeled PAU 2026 and 06-05-2026, given on behalf of the Transmutex team, names START as Subcritical Transmuting Accelerated Regenerative Technology, a lead-cooled fast reactor with thorium as the primary fuel, in an accelerator-driven system. It says START will produce carbon-free baseload power and reduce long-lived waste, and it marks that role as a future goal. No megawatt rating is on the extracted slides. HI-BEAM is a separate isotope project on the same deck. Stored lead coolant and fast spectrum match. No rating is added to this identity-only profile. Last checked 20 Oct 2026. Transmutex: PAU 2026 slides naming START
What would change this
A Transmutex specification that states START thermal or electrical power and distinguishes it from HI-BEAM. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The 06-05-2026 Transmutex slides name START and do not state MWe or MWth. The homepage does not name START. The NEA dashboard was not used. No rating is stored on this identity-only profile. Last checked 20 Oct 2026. Transmutex: PAU 2026 slides naming START
What would change this
A Transmutex data sheet with START megawatts and the output basis. Next scheduled check: 20 Jan 2027.