Designs

XAMR

XAMR is NAAREA's fast-spectrum molten-salt reactor concept, at basic design in its ARIS status report.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Basic design.
Evidence
5 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Fast
Developer / vendor(s) as of 14 Feb 2025
NAAREA
Development status (as stated)
Basic design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: source unavailable; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(5)

Evidence and open questions

(2 notes)
  • Evidence review. The NEA dashboard was not quoted. The attached ARIS status report is used only for coolant, neutron spectrum, and the stated design status. Its power figures, temperatures, and commercial prose are not quoted. The permitted sentence calls XAMR a fast spectrum molten salt reactor. The report dates prototype basic design and pre-licensing to 2024, and says the pre-licensing phase started in September 2024. Three NAAREA fetches on 20 October 2026 failed before any passage was read: DNS failure for www.naarea.fr, and certificate hostname mismatches for naarea.fr and bo.naarea.fr. Version, purpose, developer, output, and deployment were not taken from ARIS. The failed fetches left those questions unanswered. Last checked 20 Oct 2026. IAEA ARIS design record: XAMR; NAAREA technology page (www host); NAAREA technology page (apex host); NAAREA and FWR partnership press release
    What would change this

    A readable NAAREA page that names XAMR and states output basis, developer role, and whether any plant is sited. Next scheduled check: 20 Jan 2027.

  • Module rating: Source unavailable. The attached ARIS record is restricted and was not used for a rating. Three NAAREA fetches failed before any passage was read. The NEA dashboard was not quoted. Last checked 20 Oct 2026. NAAREA technology page (www host); NAAREA technology page (apex host); NAAREA and FWR partnership press release
    What would change this

    A readable NAAREA page that states one XAMR module electrical or thermal output. Next scheduled check: 20 Jan 2027.