Designs / dsn-cr-100

CR-100

Research Centre Řež modular pressurized-water reactor concept of 100 MWth. The developer describes 30.5 MWe in full-condensing mode or approximately 9 MWe plus 72 MW heat in cogeneration; these operating modes are not one unqualified electrical rating. The 2023 government roadmap records early design work. Separate from Energy Well; no deployment or permission is established.

Class
SMR
Technology
Other
Coolant
light water
Spectrum
unknown
Developer / vendor(s)
Research Centre Řež
Module electrical
—
Module thermal
100 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources