Designs / dsn-daratha-microreactor

Daratha 10 MWe microreactor concept

Daratha Atomics describes a factory-manufactured, two-loop light-water pressurized-water microreactor with current engineering targets of 10 MWe and 32 MWt. No formal model designation is verified. Illustrations and certification language do not establish an approved or deployed reactor. Gross/net electrical basis is unspecified.

Class
Microreactor
Technology
Other
Coolant
light water
Spectrum
thermal
Developer / vendor(s)
Daratha Atomics
Module electrical
10 MWe (nameplate (gross/net unspecified))
Module thermal
32 MWth (nameplate; basis unspecified)
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources