Designs / dsn-david-smr

DAVID SMR

Witkowitz Atomica modular pressurized-water reactor. The May 2023 Czech roadmap describes 50 MWe and 175 MWth per reactor, with up to eight reactors per plant; gross/net electrical basis is unspecified. The developer continues to identify DAVID, but this dated configuration establishes neither a deployment nor authorization.

Catalogue identity snapshot: 2023-05 (dated technical description; not confirmation of current development). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Class
SMR
Technology
Other
Coolant
light water
Spectrum
unknown
Developer / vendor(s) as of 2023-05
Witkowitz Atomica
Module electrical
50 MWe (nameplate (gross/net unspecified))
Module thermal
175 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources