EAGLES-300

European lead-cooled SMR (about 300 MWe per the consortium); pre-licensing launched in 2025. The LEANDREA and ALFRED demonstrators are separate facilities.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source, from its vendor: EAGLES-300. Record reviewed 2 Oct 2026.
Schematic of BREST-OD-300, this type's example. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300, this type's example.

Key facts

Class
SMR
Technology
Lead-cooled fast reactor (LFR)
Coolant
Lead
Spectrum
Fast
Developer / vendor(s)
EAGLES-300 consortium
Module electrical
300 MWe (gross/net unspecified)
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. The attached consortium page did not yield readable text in this pass. Its identity, technology and existing 300 MWe rating were not reverified. No stored value is confirmed, removed or assigned to another demonstrator. Reopen on a readable primary specification. Last checked 19 Oct 2026. EAGLES-300
    What would change this

    A readable primary capture of the EAGLES-300 consortium page, or a regulator document, that states the module output separately from any demonstrator. Next scheduled check: 19 Jan 2027.