Designs / dsn-electra-forte
ELECTRA-FORTE
Historical academic concept identified as a small modular reactor in a 2013 ANS Transactions paper title by Wallenius, Bortot and Suvdantsetseg for the Canadian market. Only publisher metadata was opened. Technical parameters, developer organization, relationship to the original ELECTRA experiment and current availability remain unknown.
Catalogue identity snapshot: 2013 (dated description; not confirmation of current development or availability). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
- Class
- SMR
- Technology
- Other
- Coolant
- unknown
- Spectrum
- unknown
- Developer / vendor(s) as of 2013
- —
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-13
Tracked deployment projects
- No projects tracked here.
Design sources
- ANS Transactions 109: ELECTRA-FORTE metadata (peer_reviewed, published 2013, accessed 2026-10-13)