Designs / dsn-elyon-5

ELYON-5

EE Capital's non-proprietary NRC summary calls this a 5 MWe-class sealed, factory-fueled, heat-pipe-cooled microreactor. The output is a class description, not a confirmed gross/net rating. No deployment or permit is documented.

Class
Microreactor
Technology
Other
Coolant
other
Spectrum
unknown
Developer / vendor(s)
EE Capital, LLC
Module electrical
5 MWe (nameplate (gross/net unspecified))
Module thermal
—
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-09

Tracked deployment projects

Design sources