Flexblue
Submerged seabed pressurized-water reactor concept by DCNS (now Naval Group), listed in the IAEA's 2016 SMR booklet at 530 MWt and 160 MWe; later editions mention it only in summary text. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2016 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2016 SMR booklet describes a two-loop pressurized water reactor with two horizontal steam generators, so no integral layout is recorded. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 2016
- Naval Group (formerly DCNS)
- Module electrical
- 160 MWe (gross/net unspecified)
- Module thermal
- 530 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition) (IAEA/NEA, accessed 3 Oct 2026)
- EPJ Nuclear Sci. Technol. 1, 11 (2015): Flexblue core design (peer-reviewed, accessed 20 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. A December 2015 EPJ Nuclear Sciences and Technologies paper by DCNS authors describes Flexblue as a 160 MWe transportable subsea PWR and states a reference thermal power of 530 MWth, with 550 MWth used only as a study margin. The 2016 IAEA booklet on aris.iaea.org was used only for light-water coolant, UO2 fuel form, and the stated design status Building Partnership. Ratings, enrichment, loop configuration, and developer rows in that booklet were not quoted. No named site or license is stated. Stored 160 MWe and 530 MWth match the journal's reference figures. The stored thermal spectrum is not confirmed by the passages used. Last checked 20 Oct 2026. EPJ Nuclear Sci. Technol. 1, 11 (2015): Flexblue core design; IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
What would change this
A Naval Group statement after the 2017 rename that says whether Flexblue remains an active design and whether the core is integral or loop-type. Next scheduled check: 20 Jan 2027.
- Technology family. The IAEA's 2016 SMR booklet describes a two-loop pressurized water reactor with two horizontal steam generators, so no integral layout is recorded. Last checked 1 Nov 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
What would change this
A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.