Designs / dsn-forge-ember
Ember
Forge Atomics describes Ember as a 25 MWe pressurized-water SMR assembled in factories and transported in components on heavy-haul trucks. Gross/net basis and thermal output are unspecified. No deployed plant or permission is established. Ember Mini is a separate non-nuclear mock-up.
- Class
- SMR
- Technology
- Other
- Coolant
- light water
- Spectrum
- thermal
- Developer / vendor(s)
- Forge Atomics
- Module electrical
- 25 MWe (nameplate (gross/net unspecified))
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-13
Tracked deployment projects
- No projects tracked here.
Design sources
- Forge Atomics: Ember (company_primary, accessed 2026-10-13)