Designs

GA-TES

General Atomics Tactical Energy System, a liquid-metal-cooled microreactor advanced under the Army Janus Program; reported design baseline about 5 MWe.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
Announced: General Atomics GA-TES at Fort Hood (Army Janus).
Evidence
2 sources; first primary source: ga.com: GA-TES. Record reviewed 2 Oct 2026.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Lead
Developer / vendor(s)
General Atomics
Module electrical
approximately 5 MWe (net)
Fuel form
UZrH
Enrichment
HALEU
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Spectrum
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Design sources

(2)

Evidence and open questions

(3 notes)
  • Evidence review. General Atomics' page describes the General Atomics Tactical Energy System (GA-TES) as a microreactor drawing on TRIGA heritage and uranium-zirconium hydride (UZrH) HALEU fuel, with a below-grade, low-pressure, pool-type lead coolant system using natural circulation, designed for continuous resilient baseload power at defense installations. GA states a baseline net output of approximately 5 MWe per unit, with an architecture scalable to approximately 20 MWe; no thermal rating is given. POWER's report of 26 August 2026 says the Army selected General Atomics Electromagnetic Systems under the Janus Program to advance GA-TES through development, testing and site-planning milestones at Fort Hood toward potential deployment, which connects the linked Fort Hood deployment as a program selection, not a license or construction decision. No opened source states the neutron spectrum. The stored General Atomics vendor and UZrH/HALEU fuel match; the stored 'other' coolant differs from GA's explicit lead coolant, and the approximately 5 MWe net baseline is not yet stored. Last checked 19 Oct 2026. ga.com: GA-TES; POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    A GA-TES design document or Army/DOE Janus authorization record stating the neutron spectrum and confirming the rating of the unit planned for Fort Hood. Next scheduled check: 19 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. Neither GA's page nor POWER states GA-TES's neutron spectrum. GA cites the prompt negative temperature feedback of UZrH fuel; a hydride fuel points toward a moderated core but is not a stated spectrum, so the field stays unknown. Last checked 19 Oct 2026. ga.com: GA-TES
    What would change this

    A General Atomics technical paper or regulatory submission for GA-TES stating the neutron spectrum. Next scheduled check: 19 Jan 2027.

  • Module rating. GA states a baseline net output of approximately 5 MWe per GA-TES, scalable to approximately 20 MWe in a larger architecture, and POWER repeats the same figures. The 5 MWe is a net, approximate per-unit baseline; 20 MWe is a scaled variant, not the baseline. No thermal rating is given. Last checked 19 Oct 2026. ga.com: GA-TES; POWER: U.S. Army mobilizes $2.2B Janus program
    What would change this

    A Janus program or GA document confirming the rating of the Fort Hood unit, or a GA-TES thermal rating. Next scheduled check: 19 Jan 2027.