Hadron Halo
Factory-built integral light-water microreactor of 10 MWe per module. Hadron explicitly names it Halo Modular Microreactor (Halo MMR), matching the NRC’s Hadron MMR pre-application description of 10 MWe and 35 MWth. Pre-application work concerns future manufacturing and combined-license applications, not an issued license or a selected deployment site. The NRC page describes a ten-year refuelling cycle, while Hadron’s April 2026 release states six years. This unresolved difference is not reduced to one cycle length.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: Hadron Energy FAQ. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Integral pressurized water reactor (iPWR)
The Integral PWR classification records the vendor’s wording, rather than independent certification of the internal configuration. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- Hadron Energy
- Module electrical
- 10 MWe (gross/net unspecified)
- Module thermal
- 35 MWth (nameplate; basis unspecified)
- Enrichment
- LEU+ in NRC and Hadron descriptions. Hadron’s April 2026 release specifies no more than 8.0 wt% U-235.
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- Hadron Energy FAQ (company, accessed 2 Oct 2026)
- NRC: Hadron Energy pre-application activities (regulator, page updated 2 Oct 2026, accessed 16 Oct 2026)
- Hadron: principal design criteria submission for Halo MMR (company, published 22 Apr 2026, accessed 16 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Hadron's 22 April 2026 release says the Halo Modular Microreactor is a 10 MWe integral pressurized-water reactor and that a Principal Design Criteria white paper was submitted on 10 April 2026 under NRC Project No. 99902144. The NRC pre-application page for that docket describes the Hadron Micro Modular Reactor as a factory-built light-water cooled and moderated microreactor of 10 MWe and 35 MWth, and it does not print the word Halo. The company FAQ uses Hadron Halo and Hadron MMR for a 10 MWe light-water reactor. Pre-application is not an issued license. The SEC Form S-4 effectiveness on 15 April 2026 is a corporate registration event. Refuelling is 6 years in Hadron's texts and 10 years on the NRC page. Last checked 20 Oct 2026. Hadron: principal design criteria submission for Halo MMR; NRC: Hadron Energy pre-application activities; Hadron Energy FAQ
What would change this
An NRC or Hadron document that uses the name Halo and states one refuelling cycle and the 35 MWth figure together. Next scheduled check: 20 Jan 2027.
- Technology family. The Integral PWR classification records the vendor’s wording, rather than independent certification of the internal configuration. Last checked 1 Nov 2026. Hadron: principal design criteria submission for Halo MMR
What would change this
An independent regulator or IAEA description of the Halo MMR's primary-circuit layout. Next scheduled check: 1 Feb 2027.