HARPIA
Heat-pipe microreactor by Terminus R&D in Energy, Brazil. The IAEA's September 2026 microreactor outlook (IAEA/PAT/016) places it at 15 MWth and basic design and uses it as its example of a microreactor integrated with electric and non-electric applications. No electrical rating is stated. This is a dated IAEA description, not confirmation of current availability, a named deployment or authorization.
- Reactor type
- Heat-pipe microreactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016. Record reviewed 6 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Coolant
- Other (see description)
- Developer / vendor(s)
- Terminus R&D in Energy S.A.
- Module thermal
- 15 MWth (nameplate; basis unspecified)
- Not yet recorded
- Neutron spectrum (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
- Record reviewed
- 6 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Spectrum
- Not recorded
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016 (IAEA/NEA, accessed 6 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The IAEA 2026 microreactor outlook lists HARPIA, from Terminus Research and Development in Energy S.A. in Brazil, among heat-pipe designs, and Figure 6 presents it as an example of electric and non-electric applications. The extracted power chart does not put a readable megawatt figure in a sentence that names HARPIA, so the stored 15 MWth is not confirmed. Coolant and neutron spectrum are not named. No site or license is stated. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A Terminus data sheet that states HARPIA power, coolant, and neutron spectrum in prose. Next recheck due .
- Neutron spectrum: Not disclosed in the reviewed evidence. The 2026 outlook places HARPIA with heat-pipe microreactors and does not say thermal, fast, or epithermal. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A Terminus or IAEA sentence that names HARPIA's neutron spectrum. Next recheck due .
Cite or share this page
SMRMap. “HARPIA”. Record reviewed 6 Oct 2026. https://smrmap.com/designs/dsn-harpia/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Labeled microreactor
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.