HeFASTo
Small modular gas-cooled fast reactor concept of 200 MW thermal.
- Reactor type
- Gas-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source, from its vendor: ÚJV Řež: HeFASTo. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Gas-cooled fast reactor (GFR)
- Coolant
- Helium
- Spectrum
- Fast
- Developer / vendor(s)
- ÚJV Řež
- Module thermal
- 200 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- ÚJV Řež: HeFASTo (company, accessed 2 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The ÚJV Řež page describes HeFASTo as a gas-cooled fast reactor concept of 200 MW thermal, with electricity, high-temperature heat, and hydrogen among its intended services. It names UJV Rez as the R&D developer and distinguishes the ALLEGRO GFR demonstrator. The roadmap gives a start of HeFASTo development and later targets, including a 2040 building-license line that is a plan, not an issued license. The page does not state an electrical megawatt rating or use the word helium. No plant site is named. Last checked 20 Oct 2026. ÚJV Řež: HeFASTo
What would change this
A ÚJV page that states whether the 2025 pre-conceptual milestone was completed and names the coolant gas. Next scheduled check: 20 Jan 2027.