How small reactor types work · Designs of this type
How a gas-cooled fast reactor works
EM2 is a helium-cooled fast reactor, which SMRMap's records file as a gas-cooled fast reactor (GFR): hot helium from the core drives a gas turbine directly.[1, pp. 179, 180] The section says it has no steam generator and no separate primary pumps.[1, p. 180]
This page explains the type on one documented design, simplified; other designs of the type can differ. It describes the design, not a project: see the EM2 record. SMRMap tracks no project using it.
- Hot helium going to the turbo-compressor, as the section's text gives
- Schematic routing through the heat exchangers and compression stage back to the vessel, and from the core to the vessel's wall: exact equipment positions and connections are not described in the section's text
- How heat reaches the Rankine bottoming cycle, not described in the section's text
The parts, numbered as in the figure
1. Reactor pressure vessel
The catalog's table gives the vessel as 12.5 m high and 4.6 m in diameter, weighing 280 metric tons.[1, p. 179] The section says it holds the core, control mechanisms and coolant channels.[1, p. 180] Its containment is a sealed, below-grade structure divided into two connected chambers.[1, p. 181] The catalog's picture, which is not labeled, shows one vessel in one chamber and a larger vessel in the next, joined by a horizontal duct; this page takes the first as the reactor and the second as the power conversion system, which the text does not say.[1, p. 179]
2. Core
The core has 85 hexagonal assemblies of uranium carbide fuel, enriched under 17%, in silicon carbide composite cladding.[1, p. 179] "Fast" describes the neutrons, not the helium: there is no moderator to slow them, which is what the table's "N/A" under moderator means. The section calls the core "convert and burn": it turns fertile material, which does not readily fission, into fissile fuel and burns it where it sits.[1, pp. 179, 180] The section says the core is designed to run for 30 years without adding or moving fuel.[1, p. 181]
3. Reflectors
Zirconium alloy and graphite reflectors, around the fuel, are there to sustain the neutron flux, the section says.[1, p. 180] Their place and shape in the figure are schematic.[1, pp. 179–182]
4. Control rods and shutdown rods
The core has 18 control rods, and 12 shutdown rods besides.[1, p. 180] The control rods use a ball-screw mechanism, and linear motors drive the shutdown rods.[1, p. 180] The section does not say which end of the core they enter, so their position above it, like the number of rods drawn, is schematic.[1, pp. 179–182]
5. Turbo-compressor
Hot helium from the core drives this machine, part of the power conversion system, in a closed Brayton cycle, a gas turbine loop.[1, p. 180] The same machine keeps the helium circulating, so there are no separate primary pumps.[1, p. 180]
6. Heat exchangers
The power conversion system includes heat exchangers, which pass heat on toward the ultimate heat sink, where the plant finally sheds its waste heat.[1, p. 180]
7. Rankine bottoming cycle
After the gas turbine, a second power cycle, called a Rankine bottoming cycle, is part of the same power conversion system.[1, p. 180] The section gives 53% net conversion efficiency for the two together, assuming evaporative cooling.[1, p. 179] A Rankine cycle is the kind a steam power plant uses; the section does not say what fluid this one uses or describe it further, so it is a plain block here.[1, pp. 179–182]
The coolant path
- Helium is the primary coolant, in a closed loop that takes heat from the reactor to the power conversion system.[1, p. 180]
- Hot helium from the core drives the turbo-compressor, which keeps the helium moving through the core and the power conversion system.[1, p. 180]
- The table lists the helium at 550 °C at the core inlet and 850 °C at the core outlet.[1, p. 179]
- The section's text does not say which way the helium passes through the core, where it leaves the core, or how it gets back to the reactor, so the figure draws no line through the core, and the stretch from the core to the vessel wall and the way back are dashed.[1, pp. 179–182]
- The catalog's picture is not labeled, so the place of everything in the figure, apart from the vessel's size, is schematic.[1, p. 179]
Is this a high-temperature gas reactor?
The catalog gives two answers: its table lists the reactor type as HTGR, and its text calls EM2 a helium-cooled fast reactor.[1, p. 179] HTR-PM lists graphite as its moderator; EM2 lists no moderator. This page follows the text's fast-reactor description. The conflicting HTGR table label remains unresolved.[1, pp. 179, 229] SMRMap's records file it as gas-cooled fast, so it is on this page. These are examples from one catalog, not a full list, and the interactive view shows EM2 only.
- EM2. Helium coolant with no moderator listed, and helium that goes straight to a gas turbine.[1, pp. 179, 180]
- HTR-PM. Helium coolant with a graphite moderator, and helium that goes to a steam generator.[1, pp. 229, 230]
- Steam generator and pumps. The section says EM2 has no steam generator and no separate pumps in its helium circuit; it also lists a Rankine bottoming cycle, which it does not describe.[1, p. 180]
Design values
These are values listed in the catalog section, which the developer supplied; the same table gives the design status as conceptual design.[1, p. 179] SMRMap's record for EM2 stores no output figure, so its line in the list below shows a dash; the figures here are the catalog section's own.
- Power. 500 MW(t) of heat and 265 MW(e) of electricity per module; the text calls the electrical figure net, and the table gives 1060 MW(e) for a plant that the layout section describes as four such reactors.[1, pp. 179, 182]
- Helium. 13.3 MPa, with 550 °C at the core inlet and 850 °C at the core outlet.[1, p. 179]
- Fuel. Enrichment under 17%, with no refueling or moving of fuel for 30 years, as the section puts it.[1, pp. 179, 181]
Designs on SMRMap recorded as this type
4 designs, with no tracked project. Each design's type comes from its own record on SMRMap; the example above is one of them, and the others can differ from it.
| Design | Class | Electrical output | Tracked projects |
|---|---|---|---|
| ALLEGRO gas-cooled fast-reactor demonstrator | SMR | 0 MWe (thermal only) · module | None tracked here |
| EM2 | SMR | — | None tracked here |
| FMR | SMR | — | None tracked here |
| HeFASTo | SMR | — | None tracked here |
Sources
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) — IAEA ARIS (catalog host; profiles supplied by contributors). EM2 section, printed pages 179–182; HTR-PM section, printed pages 229–230. Each section is contributor material; the EM2 section was supplied by General Atomics.