JH-100 (Junhe One)
100 MWe small modular pressurized water reactor from Shanghai JHATOM Atomic Technology, described in 2026 trade press as an integrated pool-type passive design at concept stage. No deployment site.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source, from its vendor: Shanghai JHATOM Atomic Technology: JH-100. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The developer's page names the JH-100 a small modular pressurized water reactor but does not describe an integral layout, so none is recorded. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- Shanghai JHATOM Atomic Technology
- Module electrical
- 100 MWe (gross/net unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- Shanghai JHATOM Atomic Technology: JH-100 (company, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The Shanghai JHATOM page names JH-100 as a small modular pressurized-water reactor and says deployment is targeted within the next 3 to 5 years. It does not state a megawatt rating, so the stored 100 MWe was not inferred from the name. It does not say integral, pool-type, or thermal spectrum. SSMR-50 is a high-temperature gas-cooled reactor and MMR-5 is a mobile microreactor on the same page. The company was founded in 2025. The Shanghai address is the company office. No license or plant site is stated. Last checked 20 Oct 2026. Shanghai JHATOM Atomic Technology: JH-100
What would change this
A JHATOM specification that states JH-100 electrical or thermal output and whether the vessel is integral. Next scheduled check: 20 Jan 2027.
- Technology family. The developer's page names the JH-100 a small modular pressurized water reactor but does not describe an integral layout, so none is recorded. Last checked 1 Nov 2026. Shanghai JHATOM Atomic Technology: JH-100
What would change this
A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.