Designs / dsn-kaist-atom

KAIST ATOM

Autonomous Transportable On-demand Reactor Module, a 450 MWth PWR-type small modular reactor in a 2020 KAIST publication. Electrical output and an integral vessel configuration are not established by the opened abstract. Historical research design, distinct from KAIST MMR; no deployment is established.

Catalogue identity snapshot: 2020 (dated technical description; not confirmation of current development). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Class
SMR
Technology
Other
Coolant
light water
Spectrum
unknown
Developer / vendor(s) as of 2020
Korea Advanced Institute of Science and Technology (KAIST)
Module electrical
—
Module thermal
450 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources