LEADIR-PS100
Lead-cooled reactor of the LEADIR-PS family by Northern Nuclear Industries, listed in the IAEA's 2016 SMR booklet at 100 MWt and 39 MWe (conceptual design). This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2016 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Other (see description)
This is a lead-cooled reactor whose spectrum remains unresolved. - Coolant
- Lead
- Developer / vendor(s) as of 2016
- Northern Nuclear Industries Incorporated
- Module electrical
- 39 MWe (gross/net unspecified)
- Module thermal
- 100 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: sources conflict; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Spectrum
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition) (IAEA/NEA, accessed 3 Oct 2026)
- CNS proceedings record: Hart, LEADIR-PS, 5 November 2014 (academic, published 5 Nov 2014, accessed 20 Oct 2026)
- CNS paper: Hart, LEADIR-PS100 unit data (academic, accessed 20 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The CNS proceedings record, published 5 November 2014, says Northern Nuclear Industries Incorporated is developing LEADIR-PS and distinguishes LEADIR-PS100 at 100 MWth from LEADIR-PS300 at 300 MWth. The PS300 figure is not used for this record. The paper says the plants are focused on process heat and Canada's energy demand, and the PDF summary adds district heating and electricity production. The PDF says graphite provides neutron moderation. It does not use the word thermal, fast, or epithermal for the LEADIR-PS100 spectrum, so spectrum stays unknown and fast is not proposed. The carried fast-spectrum chapter heading remains the existing conflict and is not treated as a LEADIR-only spectrum sentence. The unit-data value list includes 38 MW (site dependant), and the label list includes Net Electrical Output, but the text extraction separates the columns. That site-dependent figure is not stored as a nameplate. The number 39 MWe does not appear. Stored 100 MWth stays. Stored 39 MWe and its unspecified basis are not changed. Barge delivery to potential sites and a funding-conditional claim that a first unit can operate within eight years do not name a project. Existing spectrum and technology-family detail reviews are not replaced. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition); CNS proceedings record: Hart, LEADIR-PS, 5 November 2014; CNS paper: Hart, LEADIR-PS100 unit data
What would change this
A LEADIR-PS100 sentence that uses the word thermal, fast, or epithermal for its neutron spectrum, and a data sheet that states one electrical output without a site-dependent qualifier. Next scheduled check: 20 Jan 2027.
- Neutron spectrum: Sources conflict. The fast-spectrum chapter placement conflicts with the detailed graphite-moderated design description; neutron spectrum remains unknown. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
What would change this
A design-specific developer or technical source explicitly resolves LEADIR-PS100 neutron spectrum. Next scheduled check: 20 Jan 2027.
- Technology family. This is a lead-cooled reactor whose spectrum remains unresolved. The graphite-moderated design description does not support assigning a fast-reactor technology family. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
What would change this
A design-specific technical source explicitly resolves its reactor family and spectrum. Next scheduled check: 20 Jan 2027.