LFR-TL-30
newcleo's transportable, long-lived lead-cooled reactor of 30 MWe named in its November 2024 public presentation. Distinct from newcleo's LFR-AS-30 and LFR-AS-200 and from the IAEA-listed LFR-TL-X family of Hydromine. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source, from its vendor: newcleo presentation to the Swiss Nuclear Forum (11 November 2024, public version). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 11 Nov 2024 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 11 Nov 2024
- newcleo
- Module electrical
- 30 MWe (gross/net unspecified)
- Module thermal
- 90 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- newcleo presentation to the Swiss Nuclear Forum (11 November 2024, public version) (company, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. newcleo's 11 November 2024 Swiss Nuclear Forum slides title the talk as a lead-cooled fast reactor and give LFR-TL-30 its own slide: a transportable long-lived mini reactor of 30 MW electric and 90 MWth, with pure lead coolant, pool layout, and refuelling beyond 10 years. LFR-AS-30 and LFR-AS-200 are separate roadmap items. The port labels are a diagram, not a site. No license is stated for LFR-TL-30. The recorded nominal reactor ratings are 30 MWe and 90 MWth. Gross/net electrical basis is not stated. Last checked 20 Oct 2026. newcleo presentation to the Swiss Nuclear Forum (11 November 2024, public version)
What would change this
A newcleo statement that says whether LFR-TL-30 has a licensing path separate from LFR-AS-30. Next scheduled check: 20 Jan 2027.