LSPR
Tokyo Institute of Technology's lead-bismuth-cooled long-life small reactor of 150 MWt and 53 MWe, which IAEA-TECDOC-1536 (2007) describes as built in a factory and shipped to site. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead bismuth
- Spectrum
- Fast
- Developer / vendor(s) as of 2007
- Tokyo Institute of Technology
- Module electrical
- 53 MWe (gross/net unspecified)
- Module thermal
- 150 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. IAEA-TECDOC-1536 (January 2007) says the LSPR is a 53 MW(e) lead-bismuth cooled reactor with an 11 to 12 year refuelling interval, developed by the Research Laboratory for Nuclear Reactors of the Tokyo Institute of Technology with MEXT funding. It is an integral-type design at the feasibility-study stage. Annex XXV's title repeats lead-bismuth eutectic cooling. A 150 MW(th) figure naming LSPR was not found. The nearby 150 MW(e) reactor is PBWFR, a different design. No site or license is stated. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
What would change this
The LSPR annex table if it states thermal power in a row that names this reactor, kept separate from PBWFR. Next scheduled check: 20 Jan 2027.