Designs

MARINA (marine molten-salt reactor)

KAERI's marine molten-salt reactor for ship propulsion, designed at about 100 MWth and 35 MWe (KAERI presentation reported June 2026). A container-ship concept with two MARINA units received ABS approval in principle in July 2026; that is a design milestone, not a deployment. KAERI's own page naming MARINA could not be opened.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources. Record reviewed 2 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Developer / vendor(s)
Korea Atomic Energy Research Institute
Module electrical
35 MWe (gross/net unspecified)
Module thermal
100 MWth (nameplate; basis unspecified)
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Spectrum
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. Haesa News of 16 July 2026 says KAERI is developing the marine molten-salt reactor MARINA and that a 15,000 TEU container-ship concept using two molten-salt reactors received ABS approval in principle. Monthly Maritime Korea's 30 June 2026 report of a KAERI briefing says MARINA is being designed at 100 MWth and 35 MWe, with liquid fuel and coolant in one system. Neither article states a neutron spectrum. The approval in principle is for the ship concept, not an operating license or a deployed ship. Samsung, KRISO, HD Korea Shipbuilding, and HMM are ship and shipping participants, not added as reactor vendors. Stored 100 MWth and 35 MWe match the briefing report. Last checked 20 Oct 2026. Haesa News: KAERI and KRISO obtain AiP for MSR-powered container ship; Monthly Maritime Korea: MARINA development status
    What would change this

    A KAERI page that names MARINA and states the neutron spectrum and whether 35 MWe is gross or net. Next scheduled check: 20 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. Both articles call MARINA a molten-salt reactor and do not say thermal, fast, or epithermal. Last checked 20 Oct 2026. Monthly Maritime Korea: MARINA development status
    What would change this

    A KAERI sentence naming MARINA's neutron spectrum. Next scheduled check: 20 Jan 2027.