MCSFR (molten chloride salt fast reactor)

Elysium Industries' fast-spectrum chloride molten salt reactor, described in the IAEA's 2020 SMR booklet as a modular configuration with options from 125 MWt / 50 MWe to 3,000 MWt / 1,200 MWe (conceptual design); no single module rating is recorded. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Fast
Developer / vendor(s) as of 2020
Elysium Industries
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: sources conflict; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The carried 2020 booklet sentences stay limited to the molten chloride salt fast reactor name, the liquid fuel and coolant sentence, the fast-spectrum conceptual-design line, and the reactor-type cell MSR – Fast Chloride. They are not used for a rating, the developer, the purpose, or a deployment. The March 2017 Elysium slide deck states chloride fuel salt, a fast spectrum, a Rankine cycle, and several electrical levels. It does not select one module rating. The page at elysiumindustries.com/technology/ retrieved on 2026-10-20 does not describe this reactor. The March 2017 Elysium deck explicitly states rated electric output of 1000 MWe and separately illustrates scalable 1000, 250, 125, 25 and 20 MWe configurations. Assigning one of these configurations to this generic stored profile remains unresolved. This is not an absence of published ratings; no single profile rating or inferred thermal output is assigned. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); Elysium Industries MCSFR slides presented to the Thorium Energy Alliance, March 2017
    What would change this

    An Elysium design document that selects one reference MCSFR module, with one electrical figure and any stated thermal figure, rather than a power list. A separate Elysium or host document would be needed to name a plant or a site. Next scheduled check: 20 Jan 2027.

  • Module rating: Sources conflict. The March 2017 Elysium deck explicitly states rated electric output of 1000 MWe and separately illustrates scalable 1000, 250, 125, 25 and 20 MWe configurations. Assigning one of these configurations to this generic stored profile remains unresolved. This is not an absence of published ratings; no single profile rating or inferred thermal output is assigned. Last checked 20 Oct 2026. Elysium Industries MCSFR slides presented to the Thorium Energy Alliance, March 2017
    What would change this

    An Elysium design document that selects one reference MCSFR module rather than a list of electrical levels. Next scheduled check: 20 Jan 2027.