MicroURANUS
UNIST's lead-bismuth-cooled reactor of 60 MWt and 20 MWe, described in the IAEA's 2020 SMR booklet as sealed after factory fueling and testing before transport (pre-conceptual design). This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead bismuth
- Spectrum
- Fast
- Developer / vendor(s) as of 2020
- Ulsan National Institute of Science and Technology (UNIST)
- Module electrical
- 20 MWe (gross/net unspecified)
- Module thermal
- 60 MWth (nameplate; basis unspecified)
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- KNS virtual spring meeting 2021: UNIST MicroURANUS marine core (academic, published May 2021, accessed 20 Oct 2026)
- Frontiers in Energy Research, 30 September 2022: MicroURANUS fuel performance (peer-reviewed, published 30 Sep 2022, accessed 20 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The 2020 booklet sentences already on this record stay limited to lead-bismuth coolant, UO2 fuel, the MicroURANUS name, and the pre-conceptual or 2022 conceptual-design status lines. They are not used for the rating, the developer, the purpose, or a deployment. The May 2021 Korean Nuclear Society paper, with UNIST affiliations, calls MicroURANUS a long-cycle lead-bismuth-cooled fast reactor for marine applications and says it evolved from the URANUS project. It states 60 MWth nominal power and, separately in the design-objective sentence, assumed 60 MWth/20 MWe. The Frontiers article published 30 September 2022 states that MicroURANUS can be operated at 60 MWth and, in a separate sentence, that it is a micro-reactor of 20 MWe. That article also calls it an LBE-cooled fast reactor. Neither paper says gross or net. Stored 60 MWth, 20 MWe, fast spectrum, LFR family, lead-bismuth coolant, and vendor UNIST stay. The Frontiers authors are at KAIST; that is a fuel-performance study, not a replacement developer. Floating plants, merchant ships, and icebreakers are application classes, not a named project. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); KNS virtual spring meeting 2021: UNIST MicroURANUS marine core; Frontiers in Energy Research, 30 September 2022: MicroURANUS fuel performance
What would change this
A UNIST specification that says whether the 20 MWe figure is gross or net. A named ship or floating-plant project would be a different fact from marine purpose. Next scheduled check: 20 Jan 2027.