Designs / dsn-myrrha-battery-smr-2014
MYRRHA-derived battery-like SMR (2014 academic concept)
The SCK CEN institutional abstract of a 2014 UCL master thesis describes a lead-alloy-cooled battery-like SMR with a long fuel cycle and a core and primary-pool concept. This descriptive name is not a verified commercial model designation. Full-thesis parameters and current development are unverified. Original MYRRHA is a separate research facility; no rating or deployment is inherited.
Catalogue identity snapshot: 2014 (dated description; not confirmation of current development or availability). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
- Class
- SMR
- Technology
- Other
- Coolant
- other
- Spectrum
- unknown
- Developer / vendor(s) as of 2014
- —
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-13
Tracked deployment projects
- No projects tracked here.
Design sources
- SCK CEN: MYRRHA-derived SMR thesis record (academic_primary, published 19 Jun 2014, accessed 2026-10-13)