NuGen Engine
High-temperature gas-cooled microreactor by NuGen LLC, described by the IAEA's September 2026 microreactor outlook (IAEA/PAT/016) as a design that removes the need for on-site refuelling and holds Australian, British, Canadian and US patents. The outlook's status figure gives 4 to 6 MWth and conceptual design; the range is kept here rather than one recorded number. No electrical rating is stated. This is a dated IAEA description, not confirmation of current availability, a named deployment or authorization.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016. Record reviewed 6 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Developer / vendor(s)
- NuGen LLC
- Not yet recorded
- Coolant (not stated in the sources read); Neutron spectrum (not stated in the sources read); Module rating (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
- Record reviewed
- 6 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(4 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016 (IAEA/NEA, accessed 6 Oct 2026)
Evidence and open questions
(4 notes)
- Evidence review. The 2026 IAEA microreactors publication shows an image of the NuGen Engine courtesy of NuGen LLC and cites it as an example of a design that does not need on-site refuelling. The power-output chart interleaves names and numbers, so the digits next to NuGen EngineTM were not used. The page does not state a coolant or a neutron spectrum. Stored HTGR was not confirmed. eVinci and LOKI are named as other designs. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A NuGen LLC page that names the Engine and states coolant, spectrum, and one power figure. Next recheck due .
- Coolant: Not disclosed in the reviewed evidence. The NuGen Engine caption and the refuelling sentence do not name a coolant. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A NuGen sentence naming the Engine coolant. Next recheck due .
- Neutron spectrum: Not disclosed in the reviewed evidence. The NuGen passages do not say thermal, fast, or epithermal. Stored HTGR was not treated as a spectrum statement. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A NuGen sentence naming the Engine neutron spectrum. Next recheck due .
- Module rating: Not disclosed in the reviewed evidence. The chart header says power output in MWth, and the extracted lines place digits beside several design names. Those digits were not assigned to the NuGen Engine. Last checked 20 Oct 2026. IAEA: Microreactors: Advances in Technology Development (2026 Outlook), IAEA/PAT/016
What would change this
A NuGen sentence that states the Engine's own megawatts. Next recheck due .
Cite or share this page
SMRMap. “NuGen Engine”. Record reviewed 6 Oct 2026. https://smrmap.com/designs/dsn-nugen-engine/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Labeled microreactor
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.