Designs

NuScale microreactor

NuScale's heat-pipe, non-light-water thermal microreactor concept of 2 to 10 MWe for terrestrial use, described in a 2023 developer conference paper; separate from the NuScale Power Module. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source, from its vendor: NuScale, The NuScale Microreactor (IGORR 2023 conference paper). Record reviewed 3 Oct 2026.
Schematic of eVinci, this type's example. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci, this type's example.

Catalog identity snapshot: 2023 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Other (see description)
Spectrum
Thermal
Developer / vendor(s) as of 2023
NuScale Power
Fuel form
liquid uranium alloy fuel
Enrichment
LEU or HALEU
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(2 notes)
  • Evidence review. NuScale's June 2023 TRTR and IGORR slides describe the NuScale Microreactor as a non-light-water thermal reactor that generates electricity and heat, with a stated terrestrial range of 2 to 10 MWe, liquid uranium alloy fuel, and a liquid moderator-coolant. Heat pipes are described as the heat-exchange interface. Later slides labeled MRX were not applied to this design. No single module number was stored. The contact line was not used. Last checked 20 Oct 2026. NuScale, The NuScale Microreactor (IGORR 2023 conference paper)
    What would change this

    A NuScale specification identifying a particular microreactor configuration and either per-module rating, or separately naming its moderator-coolant chemistry. Each question can be assessed independently. Next scheduled check: 20 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. The NuScale microreactor slide reviewed states 2 to 10 MWe for terrestrial application. It does not disclose one module number or a thermal power, so the range was not written into the numeric fields. The later MRX slides were not used. Last checked 20 Oct 2026. NuScale, The NuScale Microreactor (IGORR 2023 conference paper)
    What would change this

    A NuScale specification identifying a particular microreactor configuration and its per-module electrical or thermal rating, distinct from the existing 2 to 10 MWe product range. Either rating can be assessed independently; preserve any unstated gross/net basis. Next scheduled check: 20 Jan 2027.