Designs

POLAR-1

Megawatt-scale transportable reactor of Canadian Strategic Missions Corporation (formerly Canadian Space Mining Corporation) for remote and defense sites. Output and coolant are not stated by the developer.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
No projects tracked here.
Evidence
One source, from its vendor: Canadian Strategic Missions Corporation: POLAR-1. Record reviewed 2 Oct 2026.

Key facts

Class
Microreactor
Technology
Other (see description)
Developer / vendor(s)
Canadian Strategic Missions Corporation
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(4 without a known value)
Coolant
Not recorded
Spectrum
Not recorded
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(4 notes)
  • Evidence review. The Canadian Strategic Missions Corporation nuclear page describes POLAR-1 as a megawatt-scale reactor for remote northern, Indigenous, industrial, and defense sites, transportable by military aircraft, with a criticality target of 2028 and fleet deployments planned from 2030. It does not state a coolant, a neutron spectrum, or a numeric power. JAY-1 and ORCA-1 are different reactors on the same page. The contact line was not used. Last checked 20 Oct 2026. Canadian Strategic Missions Corporation: POLAR-1
    What would change this

    A CSMC specification that states POLAR-1 coolant, spectrum, and a numeric power. Next scheduled check: 20 Jan 2027.

  • Coolant: Not disclosed in the reviewed evidence. The POLAR-1 paragraph does not name a coolant. Last checked 20 Oct 2026. Canadian Strategic Missions Corporation: POLAR-1
    What would change this

    A CSMC sentence naming the POLAR-1 coolant. Next scheduled check: 20 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. The POLAR-1 paragraph does not say thermal, fast, or epithermal. Last checked 20 Oct 2026. Canadian Strategic Missions Corporation: POLAR-1
    What would change this

    A CSMC sentence naming the POLAR-1 neutron spectrum. Next scheduled check: 20 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. The paragraph says megawatt-scale and gives no electrical or thermal number. JAY-1 and ORCA-1 are different reactors. Last checked 20 Oct 2026. Canadian Strategic Missions Corporation: POLAR-1
    What would change this

    A CSMC power figure that names POLAR-1. Next scheduled check: 20 Jan 2027.