Designs / dsn-rapid-l

RAPID-L (lunar concept)

JAEA’s June 2005 description identifies RAPID-L as a lithium-cooled fast-reactor concept for a lunar base, with 200 kWe plant output. It describes a complete 7.6-ton reactor structure designed for one rocket launch and separate cooling, power-conversion and radiator equipment for a second. SMRMap assesses this documented packaged transport configuration as modular deployment; this is not a claim that JAEA labels it an SMR. Module electrical and thermal ratings remain unknown. IAEA-TECDOC-1536 attributes the lunar concept to CRIEPI and identifies terrestrial sodium-cooled RAPID as its successor, not the same design. This historical concept does not establish a launch, current development, a deployment or a regulatory permission.

Class
SMR
Technology
Other
Coolant
other
Spectrum
fast
Developer / vendor(s)
Central Research Institute of Electric Power Industry (CRIEPI)
Module electrical
—
Module thermal
—
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-08

Tracked deployment projects

Design sources