SC-HTGR (Framatome steam-cycle HTGR)
Modular prismatic-block helium-cooled reactor developed by AREVA and then Framatome Inc. in the United States, listed in the IAEA's 2014-2020 SMR booklets at 625 MWt and 272 MWe (conceptual design). Listed by WNA under the name Antares; unrelated to Antares Nuclear. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 4 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- Framatome Inc.
- Module electrical
- 272 MWe (gross/net unspecified)
- Module thermal
- 625 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(4)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- IAEA, Advances in Small Modular Reactor Technology Developments (2014 edition) (IAEA/NEA, accessed 3 Oct 2026)
- Delrue, Shahrokhi, and Lommers, Framatome SC-HTGR heat transport system, HTR 2018 (academic, dated Oct 2018, accessed 20 Oct 2026)
- Miller, Lommers, and Shahrokhi, Framatome SC-HTGR reactor cavity cooling system, HTR 2018 (academic, dated Oct 2018, accessed 20 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The carried 2020 booklet sentences stay limited to graphite moderation, helium coolant, UCO TRISO fuel, and the conceptual-design status line. They are not used for the developer, the purpose, the rating, or a deployment. Two Framatome papers from HTR 2018, Warsaw, 8-10 October 2018, were opened. Paper 7071 states a nominal 625 MWth and a nominal 272 MWe in full electric mode for the SC-HTGR module. Paper 7068 says the reference module is a 625 MWth prismatic block reactor and that each steam generator has a heat duty of 315 MW thermal. The preview URL for paper 7071 was a PDF.js shell; the paper text is the file that shell names. No site is named. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); Delrue, Shahrokhi, and Lommers, Framatome SC-HTGR heat transport system, HTR 2018; Miller, Lommers, and Shahrokhi, Framatome SC-HTGR reactor cavity cooling system, HTR 2018
What would change this
A Framatome document that names a site or a specific plant for the reference SC-HTGR module, and a sentence that says whether 272 MWe is gross or net. Next scheduled check: 20 Jan 2027.