Designs

Stable Salt Reactor - Thermal Spectrum (SSR-U with optional SSR-Th blanket)

Moltex Energy's static-fueled, graphite-moderated thermal molten salt reactor, listed in the IAEA's 2018 SMR booklet as SSR-U with an optional thorium breeding blanket (SSR-Th): 750 MWt and 300 MWe as a baseload plant, or 900 MWe as a peaking plant using thermal storage. Not the existing fast-spectrum SSR-W, and not shown to be the later 40 MWt SSR-U of MoltexFLEX. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA, Advances in Small Modular Reactor Technology Developments (2018 edition). Record reviewed 3 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Catalog identity snapshot: 2018 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s) as of 2018
Moltex Energy
Module electrical
300 MWe (gross/net unspecified)
Module thermal
750 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. The 2018 IAEA booklet is hosted at aris.iaea.org, so only the neutron spectrum, fuel form, coolant wording, and the stated design status were used. The introduction calls this section the thermal spectrum SSR-U and says the fuel is molten salt. The parameter block ends with Pre-concept before the introduction. Ratings, Moltex as developer, and the application section were not used. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2018 edition)
    What would change this

    A Moltex page that names the thermal-spectrum SSR-U, not SSR-W, and states one module rating and the primary coolant. Next scheduled check: 20 Jan 2027.