SSTAR (Small Secure Transportable Autonomous Reactor)

Lead-cooled small modular fast reactor of 45 MWt and 20 MWe from the US Generation IV program, described in IAEA-TECDOC-1536 (2007) as a sealed, transportable concept. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Schematic of BREST-OD-300, this type's example. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300, this type's example.

Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Lead-cooled fast reactor (LFR)
Coolant
Lead
Spectrum
Fast
Developer / vendor(s) as of 2007
Argonne National Laboratory, Lawrence Livermore National Laboratory
Module electrical
20 MWe (gross/net unspecified)
Module thermal
45 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. IAEA-TECDOC-1536, January 2007, describes SSTAR as a lead or lead-bismuth fast reactor whose current reference design is 20 MW(e), and the applications section states 45 MW(th) and 19.8 MW(e). The annex names a national-laboratory team. No license or deployment site is stated. The 19.8 MW(e) sentence was not used to replace the stored 20 MW(e) reference-design figure. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
    What would change this

    A laboratory sheet that chooses lead or lead-bismuth for the 20 MW(e) SSTAR reference design and says whether the electrical figure is gross or net. Next scheduled check: 20 Jan 2027.