STAR-H2
Argonne's 400 MWt lead-cooled heat-source variant of the STAR family for thermochemical hydrogen production, with no electrical rating, described in IAEA-TECDOC-1536 (2007) with factory fabrication among its aims. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 2007
- Argonne National Laboratory
- Module electrical
- thermal only (no MWe)
- Module thermal
- 400 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. IAEA-TECDOC-1536, January 2007, describes STAR-H2 as a 400 MW(th) lead-cooled concept for thermochemical hydrogen production, with electricity only for on-site needs and no electrical rating. The summary table says fast neutron spectrum. Argonne leads the R&D. A 2030 deployment target is stated without a site or permission. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
What would change this
An Argonne STAR-H2 sheet that states an electrical rating, if any, separately from the 400 MW(th) hydrogen design. Next scheduled check: 20 Jan 2027.