STAR-LM (Secure Transportable Autonomous Reactor - Liquid Metal)
Argonne's natural-circulation lead-cooled reactor of 400 MWt and 178 MWe, the electricity member of the STAR family described in IAEA-TECDOC-1536 (2007). This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 2007
- Argonne National Laboratory
- Module electrical
- 178 MWe (gross/net unspecified)
- Module thermal
- 400 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. IAEA-TECDOC-1536, January 2007, describes STAR-LM as Argonne's lead-cooled fast reactor for electricity and optional desalinated water, at 400 MW(th) and 178 MW(e). A later annex says it draws on proven technologies and would be ready for market in 15 to 20 years. That is a projection, not a permission. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
What would change this
An Argonne STAR-LM sheet that says whether 178 MW(e) is gross or net. Next scheduled check: 20 Jan 2027.