StarCore
Helium-cooled high-temperature reactor by StarCore Nuclear, listed in the IAEA's 2020 SMR booklet with a Block One rating of 35 MWt / 14 MWe and a Block Two rating of 50 MWt / 20 MWe (pre-conceptual design). This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 13 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- StarCore Nuclear
- Module electrical
- 14 MWe (gross/net unspecified)
- Module thermal
- 35 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 13 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- StarCore: investor and technology description (company, accessed 13 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The StarCore Nuclear investor page names a helium-cooled HTGR using TRISO fuel, a 10 MWe base unit, and 35 MWt per reactor, with up to six cores. It states a first facility planned near Pinawa, Manitoba, and a CNL Stage I site application. The current page is not used to replace the separately recorded 2020 Block One configuration or its historical rating. The page does not say gross or net, and it does not say thermal, fast, or epithermal. These current vendor claims do not establish that the platform is identical to the dated 2020 Block One profile. The historical profile and its ratings remain separate. CNL site-process wording is not a CNSC construction or operating license. Last checked 20 Oct 2026. StarCore: investor and technology description
What would change this
A StarCore specification that says whether 10 MWe is gross or net and names the neutron spectrum. Next scheduled check: 20 Jan 2027.