TREDIC HTGR SMR
Helium-cooled, TRISO-fueled high-temperature gas reactor marketed in 50-300 MWe product lines, including mobile models. Developer marketing pages only; per-module output and licensing status are not published.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source, from its vendor: TREDIC SMR Program. Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- TREDIC Corporation
- Fuel form
- TRISO
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- low
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- TREDIC SMR Program (company, accessed 17 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The TREDIC SMR page, marked 2025, says TREDIC Corporation's SMR program develops TRISO-fueled helium-cooled HTGRs in a 50-300 MWe product line, with process heat, electricity, and hydrogen among the stated uses. No single module rating, neutron spectrum, named site, or granted license is stated. The seven-phase list is a rollout strategy, not a report that construction has started. Last checked 20 Oct 2026. TREDIC SMR Program
What would change this
A TREDIC specification that gives one module's electrical and thermal output and names the neutron spectrum. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The TREDIC page reviewed states a 50-300 MWe product line. No single module rating is disclosed, so the empty electrical and thermal fields were not filled. Last checked 20 Oct 2026. TREDIC SMR Program
What would change this
A TREDIC sheet with one module's MWe or MWth. Next scheduled check: 20 Jan 2027.