Designs / dsn-vityaz

Vityaz

Rosatom’s 21 August 2024 house publication names Vityaz among modular reactor concepts, including vehicle-chassis configurations, at technical-proposal or sketch-concept stage. This supports a historical design profile. The opened article does not independently identify Vityaz’s developer, coolant, neutron spectrum or output; these remain unknown rather than being imported from directory entries or search snippets. It is a distinct named concept, not an alias for ATGOR. This dated description does not establish current development, a deployment or a regulatory permission.

Class
SMR
Technology
Other
Coolant
unknown
Spectrum
unknown
Developer / vendor(s)
—
Module electrical
—
Module thermal
—
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-08

Tracked deployment projects

Design sources