Designs / dsn-vver-i

VVER-I

Gidropress integral modular water-cooled reactor with natural circulation, described by Rosatom in April 2023 at 250 MWth. A possible increase to 400 MWth is an uprating prospect, not another profile. Electrical output is not stated. Separate from VBER designs and conventional VVER-1000; no deployment is established.

Catalogue identity snapshot: 2023-04 (dated technical description; not confirmation of current development). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
light water
Spectrum
unknown
Developer / vendor(s) as of 2023-04
OKB Gidropress
Module electrical
—
Module thermal
250 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources