XENITH
X-energy's transportable high-temperature gas-cooled microreactor point design, in NRC pre-application review since November 2023 (docket 99902118); the NRC gives a range of 3 to 10 MWe, so no single rating is recorded. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- One source (regulator): NRC pre-application activities: X-energy XENITH microreactor. Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 3 Oct 2026 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 3 Oct 2026
- X-energy
- Inclusion basis
- Labeled microreactor
- Confidence
- high
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(1)
- NRC pre-application activities: X-energy XENITH microreactor (regulator, accessed 3 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The NRC pre-application page says pre-application with X-energy for the XENITH high-temperature gas-cooled microreactor point design began in November 2023, docket 99902118, at 3 to 10 MWe. The page does not name the gas or the neutron spectrum. Pre-application review is not a construction permit, and no site is named. Last checked 20 Oct 2026. NRC pre-application activities: X-energy XENITH microreactor
What would change this
An X-energy XENITH sheet that names the coolant gas, the neutron spectrum, and one module rating inside the 3 to 10 MWe range. Next scheduled check: 20 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The NRC page reviewed states 3 to 10 MWe. No single module rating is disclosed, and thermal power is not stated, so the empty rating fields were not filled. Last checked 20 Oct 2026. NRC pre-application activities: X-energy XENITH microreactor
What would change this
An X-energy sheet with one XENITH module rating. Next scheduled check: 20 Jan 2027.