Designs / dsn-ziacore

ZiaCore

Los Alamos National Laboratory’s heat-pipe-cooled microreactor design uses uranium-dioxide fuel and graphite and zirconium-hydride moderators. LANL report LA-UR-26-26997 distinguishes the full design from the 2026 critical experiment, which tested a representative portion using the Deimos testbed and an existing Comet critical assembly. That experiment is not counted as a separate deployed ZiaCore power reactor. Design output and commercial availability are unknown.

Class
Microreactor
Technology
Other
Coolant
other
Spectrum
unknown
Developer / vendor(s)
Los Alamos National Laboratory
Module electrical
—
Module thermal
—
Fuel form
UO2
Inclusion basis
microreactor_labeled
Confidence
high
Last verified
2026-10-13

Tracked deployment projects

Design sources